Publication Date
October 9th, 2026
Deadline for Submission
November 09th, 2026
Request for Proposal for T-off & DTx Metering Integration Works Lots 2 and 3
(RFP Ref: AEG-WP-AUG26-TOFF-L2&3)
1. Requestor
CONTRACTING AUTHORITY : WEZA POWER - Burundi
CONTACT NAME : Hervé NTUMBA
DATE : 09th October 2026
EMAIL : herve.ntumba@wezapower.com / procurement@wezapower.com
BID SUBMISSION DATE : 09th November 2026
Service Providers invited to this Request for Proposal (RFP) and interested in bidding on this project are requested to review the information provided in this cover letter and in the attached annexes. Proposal and/or Request for Clarification shall be addressed to the requestors’ contacts provided above.
2. Background and Purpose of the consultation
Anzana Electric Group (referred to herein as “Anzana”) is a renewable energy company focused on the development, financing, construction and operation of power generation and distribution assets across Sub-Saharan Africa, the group currently operates through entities incorporated in Mauritius, Kenya, Tanzania, Burundi and Zambia with potential expansion into additional countries in the coming years.
Weza Power (referred to herein as “WP” or “Weza”), a subsidiary of Anzana, is a privately owned and operated electricity distribution company in Burundi. Weza’s mission is to connect 9 million people by providing electricity to residential and business customers across peri-urban and rural Burundi, over the next decade.
Weza Power has completed a detailed assessment of transformer metering integration and network sectionalizing requirements on the selected 30 kV network. The assessment report and the approved detailed design serve as the basis for the refurbishment of distribution transformer metering systems and the installation of network sectionalizing equipment. The purpose of this assignment is to supply, install, test, commission and place into service the specified equipment in accordance with the approved designs, technical specifications and construction standards.
The installations shall facilitate transformer-level energy monitoring, technical and commercial loss management, improved fault isolation, reduced outage durations, and readiness for future network automation and digitalization initiatives.
The Works shall be executed in compliance with the Employer's requirements, applicable national regulations, REGIDESO utility standards, relevant IEC standards, prudent industry practice, and the World Bank’s requirements, including applicable environmental, social, health and safety requirements.
Weza Power therefore intends to appoint a competent contractor (the "Contractor") to execute the Works described in Section 3 and detailed in Appendix A (Scope of Work). The Employer reserves the right to award Lot 2 and Lot 3 to a single contractor or to separate contractors, whichever represents best value to Weza, as the Employer.
3. Scope of work
The Works comprise the supply, installation, testing, commissioning and placing into service of distribution transformer metering integration equipment (Transformer Breaker Boxes fitted with Advanced Metering Infrastructure) and network sectionalizing equipment (dropout fuse cutouts and load break switches) at the locations identified in the approved detailed design. The indicative quantities per lot are as follows:
Lot 2 - Musasa - Muyinga corridor (Buhumuza, Gitega and Butanyera Provinces): 35 transformer metering integration installations (27 Type B and 8 Type C) and 18 sectionalizing points (11 no. 5A T-type fuse links, 1 no. 10A T-type fuse link and 6 no. 400A outdoor air-insulated load break switches).
Lot 3 - Sud - Ijenda corridor (Bujumbura Province): 8 transformer metering integration installations (5 Type B and 3 Type C) and 4 sectionalizing points (2 no. 5A T-type fuse links, 1 no. 10A T-type fuse link and 1 no. 400A outdoor air-insulated load break switch).
The Contractor's obligations shall include, but shall not be limited to, the following:
- Site identification, verification and preparation, including confirmation of approved installation locations, existing site conditions, accessibility, clearances, structural suitability and safety requirements, and prompt notification to the Employer of any discrepancy between the approved detailed design and actual site conditions;
- Planning, coordination and execution of all planned outages in close consultation with the Employer and REGIDESO, including obtaining all necessary approvals and permits prior to any switching operation and performing all switching, isolation, earthing and restoration strictly in accordance with REGIDESO's approved operating and switching procedures;
- Decommissioning, dismantling and repositioning of existing transformers, reporting on transformer condition, and installation of new single-pole or H-pole structures at designated sites;
- Re-mounting of transformers and installation of Transformer Breaker Boxes with associated accessories in accordance with the technical specifications (Codes ZG3 and TBB), including connection of HV and LV bushings to REGIDESO standards and correct wiring of the meter;
- Installation of earthing and bonding systems, communication devices and communication interfaces, and integration of metering systems with existing or future AMI, SCADA or DMS platforms, including verification of communication functionality;
- Supply and installation of network sectionalizers on and/or support structures, pole modifications and reinforcement works where required, installation of conductors, jumpers and connectors, operating handles and mechanisms, and labels and identification plates;
- Testing and commissioning, including meter accuracy tests, functional tests, communication tests, continuity checks and visual inspection, confirmation of proper operation of the fuse and sectionalizing function, end-to-end integration tests, and commissioning and energization support with a commissioning checklist for each site;
- Weekly progress reporting to the Employer, including photographs, test results and updated site information;
- Submission of all deliverables, including factory test certificates, installation reports, test and commissioning reports, equipment configuration files, as-built drawings, GIS asset data, operation and maintenance manuals and spare parts lists, in both editable and non-editable formats; and Appendix A, Appendix A shall prevail.
- Training of Employer personnel and rectification of all defects identified during inspection and commissioning, up to formal acceptance of the Works by the Employer.
Bidders are required to review Appendix A (Scope of Work) in its entirety, together with its Annexes (Annex A - Single Line Diagrams, Annex B - Identified Transformers for Metering Integration and Sectionaliser Installation, and Annex C - Weza Power Design Guidance), before preparing their proposals. In the event of any inconsistency between this Section 3 and Appendix A, Appendix A shall prevail.
4. Eligibility and Instruction for Submission
a. CONDITION OF ELIGIBILITY
This RFP has been primarily launched on a Restricted basis, and invitations have been sent to suppliers identified through preliminary market research. However, the tender document has also been Published on Weza Power ‘s website (www.wezapower.com) for awareness in case a supplier in local market is interested in participating.
All bidders submitting a proposal under this RFP are required to provide a set of documents and evidence to satisfy our Know Your Suppliers (KYS) requirements. This process enables the contracting authority to assess the suppliers’ capacity, strengths and weaknesses, verify the legitimacy, financial stability, and regulatory compliance.
Only service providers deemed eligible following this initial compliance review will be considered for technical and financial evaluations.
b. INSTRUCTIONS FOR SUBMISSION
The following instructions apply to the preparation, submission, and evaluation of proposals under this RFP.
- All proposals and supporting documentation shall be prepared and submitted in English;
- Proposals shall remain valid for a period of one hundred and twenty (120) calendar days from the bid submission deadline;
- For evaluation purposes, all bids will be assessed in United States Dollars (USD). Proposal submitted in other currencies will be converted into United States Dollars (USD) using the Oanda exchange rates (https://www.oanda.com) applicable on the submission deadline date.
- Bidders legally registered in Burundi must submit their bids in Burundian Francs (BIF). Foreign bidders may submit their bids in US Dollars (USD). Payment will be made in Burundian Francs (BIF) if the successful bidder is officially registered in Burundi. Otherwise, payment will be made in United States Dollars (USD) for other bidders
- Bidders are requested to submit their financial proposal in two (2) versions:
- One (1) in an editable format (for evaluation purpose)
- One (1) in a non-editable format.
- In case of discrepancy, the non-editable version shall prevail.
- All other documents (technical proposal, annexes, supporting material …) must be submitted in a non-editable format. Proposals shall be submitted by email to the address specified in Section 1, or by such secure file-share link as the Employer may specify. Bidders are responsible for confirming receipt of their submission;
- A local preference shall be applied for evaluation purposes only, in accordance with Section 7;
- Proposals received after the bid submission deadline shall not be accepted under any circumstances;
All prices shall be inclusive of all applicable taxes, duties, levies, transport, insurance and other charges, and shall be stated on a delivered, installed and commissioned basis.
· All days should be understood as working days (Monday to Friday, excluding public holidays in Burundi).
· If an advance payment is requested for this RFP process, it must be covered by an irrevocable Advance Payment Guarantee issued by a reputable bank, for the full amount of the advance, enforceable upon first demand and valid until the issuance of taking over certificate plus one month.
· Selected bidder must provide an irrevocable Performance Guarantee, for 10% of the contract amount, issued by a reputable bank, enforceable upon first demand and valid until the issuance of performance certificate.
· Weza Power proposes the following payment schedule, applicable to each lot: one hundred per cent (100%) of the Contract Price upon delivery to site of all equipment and materials, and upon successful testing and commissioning of the Works, and issuance of the Taking-Over Certificate.
· Payment against a letter of credit is not accepted and may lead to the rejection of the proposal.
5. Submission and Procurement timeline
This procurement process will follow the indicative timeline set out in the table below. Bidders are responsible for ensuring timely submission of their proposals. The contracting authority reserves the right to adjust these dates if necessary.
Milestones
Indicative deadline or duration
RFP publication date : 09th October 2026
Acknowledgement / Intention to bid : 13th October 2026
Closing date for proposal submission : 09th November 2026
Eligibility and Evaluation phase : 16th November 2026
Short listing suppliers and Negotiation : 23th November 2026
Notice to proceed and contract signing : 30th November 2026
Bidders are requested to confirm their intention to participate, not later than the date indicated in the table above. Confirmation must be sent by email to the points of contact identified in section 1 (Requestor).
Bidders requiring any clarification regarding this RFP shall submit their questions in writing to the contracting authority at the email address specified in section 1. Requestor, at least 5 days prior to the proposal submission deadline. Questions or requests for clarification should:
· Be provided in an editable format (e.g., Microsoft Word or Microsoft Excel)
· Be numbered and clearly reference the relevant section or document of the RFP
· Telephone or in-person inquiries will not be accepted.
Responses to all questions will be distributed to all bidders who have confirmed their intention to participate within 3 days of receipt.
6. Content of the proposal
Bidders are required to structure their proposal in accordance with the format and content described below. The proposal shall be divided into three main parts reflecting the evaluation criteria detailed in section 7.2 Evaluation criteria.
Part A - Documents justifying eligibility
Bidders must submit the duly completed and signed Know Your Supplier (KYS) Questionnaire provided in Annex B – Know Your suppliers (KYS), together with all supporting documents and evidence requested therein. These documents will be reviewed to verify the Bidder’s legal standing, capacity to contract, and compliance with the eligibility requirements set out in Section 4.1 – Conditions of Eligibility
Part B - Technical Proposal
The technical proposal shall be structured in the following order:
1. Proposed Solution: The Supplier shall provide a clear summary of the proposed solution, highlight its key advantages and major assumptions, and demonstrate its understanding of the network conditions, lot geography, interfaces with REGIDESO and applicable operational constraints.
2. Methodology and Work Approach: The Supplier shall describe its proposed methodology for site verification, outage coordination, installation, meter integration, testing, commissioning and formal handover of the completed works.
3. Equipment offered: The Supplier shall provide the manufacturer, make, model, country of origin and technical data sheets for all proposed equipment, together with evidence of compliance with Weza Power’s technical specifications and applicable IEC standards.
4. Supply chain and delivery arrangements: The Supplier shall describe the proposed sourcing and supply-chain arrangements, identify key suppliers or manufacturers, and provide realistic manufacturing, transportation and delivery lead times for each lot.
5. Work program and mobilization plan: The Supplier shall provide a detailed program for each lot, showing the mobilization period, key activities, milestones, dependencies and critical path from the Notice to Proceed through testing, commissioning and formal acceptance.
6. Organisation and relevant personnel: The Supplier shall present the proposed project organisation, including the qualifications and CVs of key personnel, required professional certifications.
7. Health, safety, environmental and social management: The Supplier shall provide an HSES management plan covering, at a minimum, outage safety, working-at-height and live-line procedures, emergency arrangements, waste management and engagement with affected communities.
8. Relevant experience: The Supplier shall provide evidence of at least three (3) comparable assignments successfully completed within the last five (5) years, including a description of the scope, contract value, completion date, client references and verifiable contact detail
Part C - Commercial Proposal
The Financial Proposal must present a clear, detailed, and transparent breakdown of all costs associated with the scope of work and shall remain fully consistent with the technical proposal.
The proposal shall be deemed to include all costs necessary for the complete delivery of the scope. No additional charges shall be accepted after contract award unless explicitly requested and approved in writing by Weza Power. Any cost, assumption, or dependency not expressly identified in the proposal shall be deemed included in the proposed fees.
1. Financial Proposal: The bidder shall provide a complete and itemized pricing proposal covering the full scope of work described in this RFP. As a minimum, the pricing proposal shall include:
- Detailed cost breakdown by project phase and/or major deliverables;
- Unit rates and total prices for supply, installation, testing and commissioning, and for key personnel by category and estimated level of effort;
- Taxes and duties clearly identified.
- Any assumption or exclusion to be clearly stated and detailed
2. Validity of the offer: Bidders must ensure that their proposals remain valid for a minimum period of one hundred and twenty (120) days after the submission deadline. Bidders shall include a formal statement confirming the validity period of their proposal.
3. Contract structure: Weza Power cannot issue a draft contract at this stage of the process, consequently, Bidders are therefore requested to provide their hypotheses on the matters listed below. Responses will be considered as part of the commercial evaluation and will serve as the basis for the subsequent contract negotiations:
- Confirmation that the proposal is submitted on a fixed-price, lump-sum basis
- Identification of the proposed contracting entity
- Acceptance of the payment schedule set out in Section 4.b, or any proposed deviation
- Advance Payment and Advance Payment Guarantee
- Performance Security (amount, form, and validity period)
- Retention Money and/or Warranty Security
- Warranty and Defects Liability Period
- Transfer of Title and Transfer of Risk
- Insurance Requirements
- Limitation of Liability (including liability cap)
- Excluded Liabilities and Consequential Damages
- Liquidated Damages for Delay and/or Performance
- Ownership and Licensing of Software, Firmware, Source Code, and Intellectual Property
- Confidentiality Obligations
- Subcontracting and Assignment
- Governing Law
- Dispute Resolution Mechanism (court or arbitration, seat, rules, and language)
- Force Majeure
- Termination for Default and Termination for Convenience
7. Evaluation criteria and principle
a. EVALUATION CRITERIA
All proposals received within the submission deadline will be evaluated in accordance with the criteria and process described below.
The evaluation will be conducted in three sequential stages: eligibility review, technical evaluation, and financial evaluation. Only bidders meeting the eligibility requirements will proceed to the subsequent stages.
Step 1 - Eligibility Review:
The purpose of this review is to confirm that bidders meet the minimum eligibility requirements outlined in section
4.1 (Condition of eligibility). The review will consist of verifying the completeness and validity of the administrative documents provided in Part A - Documents justifying eligibility. Only proposals deemed compliant at this stage will proceed to the technical evaluation.
Step 2 - Technical Evaluation:
The technical evaluation will assess the quality and relevance of the bidder’s proposed approach. The documents provided in Part B - Technical Proposal will be evaluated against the following indicative criteria:
Understanding of the assignment
Demonstrated appreciation of the network conditions, lot geography, interfaces with REGIDESO and the Employer, and the principal risks and constraints affecting execution of the Works
5%
Methodology and work approach
Clarity, completeness and realism of the methodology for site verification, outage planning and coordination, installation, meter integration, testing and commissioning, including quality assurance and quality control arrangements.
10%
Equipment offered and compliance with technical specifications
Compliance of the equipment offered with the technical specifications and applicable IEC standards, supported by data sheets and type test certificates; credibility of the proposed supply chain and delivery lead times.
20%
Work programme and mobilisation plan
Realism and completeness of the programme per lot, logic of the critical path from Notice to Proceed to formal acceptance, and adequacy of mobilisation, plant and logistics arrangements.
5%
Organisation and key personnel
Adequacy of the proposed team structure and the qualifications, certifications and relevant experience of the project manager, site supervisor, qualified electricians and HSES officer.
5%
Relevant experience
Relevance, scale and recency of at least three (3) comparable assignments completed in the last five (5) years, supported by contactable client references.
10%
HSES management plan
Robustness of the HSES management plan, including outage safety, working-at-height and live-line procedures, incident reporting, waste management and community engagement.
5%
Total Technical Score
60 %
Understanding of the assignment
Demonstrated appreciation of the network conditions, lot geography, interfaces with REGIDESO and the Employer, and the principal risks and constraints affecting execution of the Works
5%
Methodology and work approach
Clarity, completeness and realism of the methodology for site verification, outage planning and coordination, installation, meter integration, testing and commissioning, including quality assurance and quality control arrangements.
10%
Equipment offered and compliance with technical specifications
Compliance of the equipment offered with the technical specifications and applicable IEC standards, supported by data sheets and type test certificates; credibility of the proposed supply chain and delivery lead times.
20%
Work programme and mobilisation plan
Realism and completeness of the programme per lot, logic of the critical path from Notice to Proceed to formal acceptance, and adequacy of mobilisation, plant and logistics arrangements.
5%
Organisation and key personnel
Adequacy of the proposed team structure and the qualifications, certifications and relevant experience of the project manager, site supervisor, qualified electricians and HSES officer.
5%
Relevant experience
Relevance, scale and recency of at least three (3) comparable assignments completed in the last five (5) years, supported by contactable client references.
10%
HSES management plan
Robustness of the HSES management plan, including outage safety, working-at-height and live-line procedures, incident reporting, waste management and community engagement.
5%
Total Technical Score
60 %
Step 3 - Financial Evaluation:
The financial evaluation will assess the competitiveness and the overall contractual approach of the bidder’s proposal. The documents provided in Part C - Financial Proposal will be evaluated against the following indicative criteria:
Evaluation criteria
Description and expectation
Weight
Financial proposal
Completeness, transparency, and consistency of the financial proposal, including pricing structure and cost breakdown
10%
Evaluation criteria
Description and expectation
Weight
Bid competitiveness
Overall competitiveness and value for money of the proposed solution.
15%
Validity of the offer
Compliance with the required offer validity period and commitment to maintain proposed commercial conditions.
5%
Contract compliance
Completeness, clarity, and balance of the proposed contractual
terms, demonstrating a fair allocation of rights, obligation and risks between the parties.
10%
Total Financial Score
40 %
Local Preference
In order to encourage the participation and development of Burundian companies, a Local Preference will apply to this procurement process.
For the purpose of this RFP, a local bidder is defined as a company legally incorporated and actively operating in Burundi and that will be the contracting entity signing the Contract if awarded. Where a proposal is submitted by a Joint Venture, the local Preference should apply where the Burundian company is the Lead Member of the Joint venture, is the contractual counterparty to the employer and is the primary recipient of the contract payments.
During the commercial evaluation, eligible Local Bidders shall benefit from an evaluation preference equivalent to a five percent (5%) reduction of their evaluated financial proposal. This adjustment shall be applied for evaluation purposes only to determine ranking or the scoring of the financial proposal. It shall not modify the Contract Price, which shall remain the price submitted by the bidder.
Final Scoring and Selection
Following the completion of the technical and financial evaluation, bidders achieving the highest combined scores will be shortlisted. Shortlisted bidders may be invited to participate in a clarification and negotiation phase, which may include discussions on technical aspects, financial proposals, implementation approach, and contractual terms.
Upon completion of this stage, Weza Power will finalize the evaluation and recommend the bidder achieving the best overall value for money for contract award, subject to final due diligence and successful agreement on contractual terms.
b. EVALUATION PRINCIPLE
Each criterion described in the evaluation grid, presented previously, will be assessed and scored on a scale from 0 to 5, based on the extent to which the bidder’s proposal meets or exceeds the expectations of the contracting authority. The scoring scale is defined as follows:
Score
Definition
0 - Not addressed / not acceptable
The proposal does not address the criteria or whether the information provided is irrelevant or incomplete.
Score
Definition
1 - Poor
The proposal provides very limited information or demonstrates minimal understanding of the requirement.
2 - Fair
The proposal partially addresses the criterion but lacks sufficient detail or clarity.
3 - Satisfactory
The proposal adequately meets the requirement with an acceptable level of detail and coherence.
4 - Good
The proposal meets the requirements well and provides clear, detailed, and relevant information.
5 - Excellent / exceeds expectation
The proposal fully addresses the requirement with exceptional clarity, depth, and added value.
Each criterion will be scored individually using the scale. The total score will then be calculated according to the weightings defined in the evaluation grid.
8. General conditions of the tender
The following conditions apply to this RFP and by submitting a proposal, the bidder acknowledges having read, understood, and accepted these conditions in full.
1/ All costs associated with the preparation and submission of proposals shall be borne entirely by the bidders. The contracting authority shall in no case be responsible or liable for such costs, regardless of the outcome of the selection process.
2/ All information provided by the bidders will be treated as strictly confidential and used solely for the purpose of evaluating the proposals. No information, in whole or in part, shall be disclosed to any external party without the bidder’s prior written consent.
3/ The contracting authority reserves the right to accept or reject any proposal, to cancel this RFP or to reject all proposals at any time prior to contract award, without thereby incurring any liability or obligation to provide reasons for this decision.
4/ This request for proposal does not constitute a commitment to award a contract or to engage in further negotiation with any bidder. Only the signature of a formal agreement should be deemed binding.
5/ All documents submitted by bidders shall become the property of the contracting authority and will not be returned.
6/ Bidders shall adhere to the highest standard of ethics and integrity during the procurement and execution phases. Any attempt to influence the evaluation process or the contracting authority may result in immediate disqualification.
9. Annexes
The annexes listed below are transmitted separately and form an integral part of the request for proposal. Bidders are required to carefully review all annexes, as they contain essential information and templates necessary for the preparation of a complete and compliant proposal.
- Appendix A - Scope of Work
- Appendix B - KYS questionnaire and documentation








